요약2 |
The purpose of this study is to consider the connection method between urban plan and flood insurance which is anticipated for activation in time. For this, the government publications of this country and research papers of the developed countries for disaster management plan were analyzed, and interview with experts were carried out. According to the results, the structural responses such as constructing a bank or dam are so limited that non-structural responses methods such as land-use planning, flood insurance, and floodproofing are needed to make the advanced urban disaster management plan. Therefore the urban plan with flood insurance system must be considered to find a solution of urban disaster management plan related to flood damage reduction. In the case of FEMA(Federal Emergency Management Agency), flood insurance rate maps distinguish several flood hazard zones, including the 100-year floodplain which is defined as an area inundated by a flood. If flood insurance system is introduced, it must be connected with not only the evaluations of flood hazard zones or architectural regulations such as limitation of base flood elevation and newly construction in 100-year floodplain, but also the stipulations of Urban Plan. |