논문명 프로젝트 공기단축을 위한 동시시공 일정시스템 / Automated Concurrent Construction Scheduling System (CS2) for Crashing Project Completion Time
저자명 최상화(Choi Sang-Hwa) ; 임태경(Lim Tae-Kyung) ; 이동은(Lee Dong-Eun)
발행사 대한건축학회
수록사항 대한건축학회논문집 구조계, v.26 n.03 (2010-03)
페이지 시작페이지(101) 총페이지(10)
ISSN 12269107
주제분류 시공(적산)
주제어 동시시공 ; 민감도 ; 전개 ; 중첩//Concurrent Construction ; Sensitivity ; Evolution ; Overlapping
요약2 This paper presents a system called "Advanced Concurrent Construction Scheduling System (CS2)" for crashing project completion time(PCT) using concurrent engineering. CS2 implements a strategy to overlap critical activities without additional resource input. It takes a risk against the alternative method(high speed-high cost) which requires additional resource input to shorten the PCT. The mathematical concepts relative to concurrent engineering (i.e., the probability of rework, the amount of rework, and criteria applying overlapping rate, etc.) are clearly defined. The procedures to formulate the variables are explained in detail. It provides an automated system which can effectively deal with a large network by complementing the existing researches which are limited to handing a small network having a few activities. How to apply the various concepts and constraints(e.g., merge event and large networks) relative to concurrent engineering are detailed. CS2 integrates and automates the following procedures; (1) importing schedule data from P3, (ingcomputing the probability of rework and the amount of rework by considering activity characteristics(predecessor's evolution and successor's sensitivity) along with specific overlapping rate, and (3ngcomputing the variability of PCT and PCC when overlapping rate are changed. It improves concurrent construction based scheduling system by dealing effectively with the uncertainty of activities' duration caused by activity overlapping, maximizes the usability of schedule data obtained from commercial CPM softwares(e.g., P3, SureTrak), and treats effectively the variability of the PCT(or PCC). This system is implemented as a MATLAB software. Case studies verify the usability and the validity of the system.
소장처 대한건축학회
스크랩하기
추천문헌 이 논문을 열람하신 아우릭 회원님들이 많이 열람하신 논문을 추천해 드립니다.
공기산정 영향요인별 실적공기 비교분석
황효상(Hwang, Hyo-Sang) ; 김경래(Kim, Kyung-Rai) ; 서상욱(Suh, Sang-Wook) ; 김창덕(Kim, Chang-Duk) ; 신동우(Shin, Dong-Woo) - 한국건설관리학회 논문집 : Vol.3 No.3 (200209)
[특집] 방수공사의 종류와 시공기술의 이해
안상로 ; 곽규성 ; 최성민 ; 오상근 - 한국건축시공학회지 : v.10 n.4(통권 제42호) (201008)
[기술정보] 흙막이가시설의 종류 및 최신공법 소개
윤성필 - 건설기술ㅣ쌍용 : 2010. 가을호(v.56) (201009)
공정관리의 실태 및 공기 단축에 대한 인식정도
김자연 ; 김의식 - 한국건축시공학회 논문집 : v.10 n.5 (201010)
[현업정보] 지하주차장 누수 사례 및 저감 방안 제안
김동균 - 건설기술ㅣ쌍용 : 2009. 봄호(v.50) (200904)
건축공사의 공기단축에 따른 비용변화
김형동 ; 이동훈 ; 박근준 - 전국 대학생 학술발표대회 논문집 : (201211)
[특집기사 : 공기단축] 공기단축 복합건설기술 개발현황 및 공기단축 저해요인
이철호 ; 홍건호 - 대림기술정보 : 2009.하반기호 (200912)
아파트 골조공사의 공기단축 및 효과적 공정운영 방안
한충희(Han, Choong-Hee) ; 방종대(Bang, Jong-Dae) - 한국건설관리학회 논문집 : Vol.5 No.4 (200408)
공기단축 기술의 개발 및 적용을 위한 공기단축 저해요인 분석
정종현(Jung Jong-Hyun) ; 이강(Lee Ghang) ; 홍건호(Hong Gun-Ho) ; 이철호(Lee Cheol-Ho) - 대한건축학회논문집 구조계 : v.26 n.01 (201001)
국내 골조공사 공기단축의 기술개발 방향에 관한 연구
손영진 ; 김재준 - 건설관리 기술과 동향 : (200911)